CN    
 

 

ClearNav Installation
Multiple installation options

Recognizing that some customers will be building their panels from scratch around the ClearNav, and some will be adding to a fully populated and crowded panel, CNI is offering three installation options.

large, bright ClearNav display
  On Panel: The basic ClearNav system will include everything you need for an on-panel installation. This installation option requires a small cutout for the nexus board and four holes for the mounting screws (matches 2 ¼” / 57 mm instrument mounting holes). On-panel installation is flexible and requires minimum panel modification. The ClearNav’s thin profile results in a sleek look, and on-panel mounting minimizes the panel footprint required. On-Panel Installation Instructions
large, bright ClearNav display   Through Panel: For those building their panel from scratch, through-panel mounting results in a flush, integrated appearance. The through-panel mounting kit includes a sturdy aluminum frame and bracket that conceals the cut-out edges. Through-Panel Installation Instructions
Behind Panel
  Behind Panel : Aluminum bezel, standoffs, support bracket and template for mounting ClearNav display behind the panel. The cutout for this mount follows the perimeter of the ClearNav display window, and the body of the ClearNav is concealed behind the panel. Behind -Panel Installation Instructions
Tunnel
  Tunnel Mount : The Tunnel Mount kit includes the tunnel fixture and all other components to support the installation. A Powder-coated aluminum "tunnel" attaches to rear of panel to set the ClearNav unit 4.5" back from the panel surface. The cutout for this mount follows the perimeter of the ClearNav display window, and the recess allows installation of other instruments next to the panel cutout. The additional shading provided by the recess also allows use of lower brightness setting, reducing power consumption. Includes standoffs, support bracket and template.Tunnel Mount Installation Instructions
large, bright ClearNav display   RAM® mount: For those whose first thought when looking at their panel is “where can I put it?” we offer a sturdy RAM mount to allow installation of the ClearNav near the side of the panel. The mount hinges permit the ClearNav to be moved to the side to permit clear viewing of any obscured instruments. RAM Mount Installation Instructions
large, bright ClearNav display   Wiring the ClearNav is simple – a single compact “nexus” board mounts all required socket connectors and provides a secure screw terminal strip for fast and easy cable connections with only a screwdriver. The nexus board either plugs directly into the back of the ClearNav or can be mounted behind the panel and connected to the ClearNav via a low-profile extension cable. We also include a small diameter (1”) panel-mounted USB/remote connector to facilitate easy access no matter the panel configuration. Cutting templates are provided where required, and any installation can be completed in under an hour. Wiring Instructions
Specifications
Size: 4.3”w x 5.8 ”h x 1.1”d (109mm x 147mm x 27mm)
Weight: 1 lb (450 g)
Display size: 3.5” x 4.6” (88mm x 117mm)
Operating System: Windows CE/.NET
Power requirements: 9 – 16 VDC
Power consumption: 0.3 to 0.7 amps at 12v (0.3 at minimum brightness, 0.7 at max)
 

 

 

Copyright © 2013 ClearNav Instruments. All rights reserved. Website by DesignTeKK.